Deployment strategy of wireless charger

Nov 15, 2019|

Shenzhen Shenchuang Hi-tech Electronics Co., Ltd(SChitec) is a high tech enterprise which specialized in phone accessories production and sales. Our main products include travel chargers, car chargers, USB cables, power banks and other digital products.All products are safe and reliable, with unique styles.products pass certificates like CE,FCC,ROHS,UL,PSE,C-Tick,etc,  If you are interested in, you can contact ceo@schitec.com directly.

 

Stay Charging Safely with Schitec 

Deployment strategy

The existing literature addresses wireless charger deployment strategies in four different scenarios:

(1) Point configuration to handle the deployment of static chargers to support static devices with wireless energy, such as Chiu [7] to minimize the number of chargers, through theoretical analysis and numerical simulation methods to solve network charging coverage using two centralized greedy algorithms Demand

(2) The goal of path configuration is to deploy a static charger in the travel path of the mobile device to charge the mobile device (such as for human wearable or implantable sensors), such as Liao [8] to maximize the survival rate, Through theoretical analysis and system-level simulation, a centralized heuristic greedy algorithm is used to solve the limitation of the number of chargers;

(3) Multi-hop configuration determines the location of static chargers placed in static networks. Devices can also have wireless energy transfer functions and can share energy with each other, such as Rault [9] to minimize the number of chargers, through numerical simulation methods. A centralized solution based on hybrid ILP solves network coverage requirements and maximizes the number of energy transmission paths;

(4) The landmark configuration involves two steps: selecting a landmark alternate access for the mobile charger and clustering the landmarks as a group to deploy the mobile charger. The location of the landmark is that the parked charger provides concurrent charging for multiple static devices in the vicinity, such as Erol-Kantarci [10], which minimizes the landmark configuration and maximizes the energy transmitted to the higher priority nodes. The simulation method utilizes the ILP-based centralized solution to solve the problem of all energy replenishment needs and the capacity limitation of the charger, as well as the maximum number of landmarks, the transmission range limited and the power demand of the node with high priority and the charger. The problem of limited capacity.


Send Inquiry